Zodiac TRI CHLORINE GENERATOR Installation Guide Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 18
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
39
ON/OFF
10
Use safety
¬
e Zodiac TRi must be installed by a pool professional. Its installation and use must comply with the
recommendations contained in this manual.
¬
During any interventions on the pool’s hydraulic circuit and/or ltering system, remember to switch o the TRi
chlorinator rst ( buon) and then switch o ltering and the mains power supply.
¬
During a lter backwash your TRi chlorinator MUST be turned o buon).
¬
Do not scrape the electrodes with a brush or a metal object, do not distort them.
¬
e maximum acceptable water temperature for water passing through the TRi cell should not be in excess of 40
°C for optimal production.
¬
Water pressure in the TRi cell must not exceed 2.75 bar (275 kPa or 40 PSI).
¬
Regularly check the TRi cell to make sure there is no debris that the lter may not have stopped and/or that there
is no scale deposit on the electrodes.
¬
e TRi command box should not be installed above a source of heat of any type (pump, heating, radiator, closed
block…). It must also be mounted on a vertical wall in a dry ventilated place.
¬
e life span of the TRi electronic equipment will be greatly increased if it is protected from direct sunlight and
humidity.
ON/OFF
Page view 16
1 2 ... 12 13 14 15 16 17 18

Comments to this Manuals

No comments