Zodiac NOOSA REEF Instruction Manual Page 15

  • Download
  • Add to my manuals
  • Print
  • Page
    / 64
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 14
Hint:
Attach the spirt level to the
straight edge using pvc adhesive tape.
Materials:
- Straight wood plank
Locate the lowest point and level the ground.
You should never fill in holes. Level out bumps instead
SITE PREPARATION
13
LEVEL POOL AREA
Unless you have access to a surveyor’s level,
the best, most accurate way to level
the ground is with a straight
plank (100mm x
50mm will do but it
should be straight)
and a spirit level (fig 2.).
Find the lowest spot within
the pool area and level the
ground to the lowest point. Dig away
the high areas – do not fill in the low
areas .
Machine excavated sites are rarely level. It is still
necessary to hand trim to ensure that the
framework will be level.The most critical areas
are the pool perimeter and cross channels.The
pool floor should be generally level but the sand
base can be used to fill any low spots. Note: If
not level, pool wall could buckle or crease.
BE SURE: recheck the level of the entire pool area. The success of installation depends upon how well this is performed.
Once the site has been cleared and levelled it is time to start assembling the base channels and P.Posts.
IMPORTANT NOTE:
Some noxious weeds, such as onion weed can grow up through the liner material damaging your pool liner.
To guard against this we reccomend that you treat the area with a suiteable weed killer(poison). Please insure the weed killer you
use is a recognised product and will not have any detremental effects on the vinyl material used in your pool liner.
STEP 7.
FIG 2
Pool
Page view 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 63 64

Comments to this Manuals

No comments