Zodiac NOOSA REEF Instruction Manual Page 21

  • Download
  • Add to my manuals
  • Print
  • Page
    / 64
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 20
POSITIONING THE CHANNELS
19
STEP 17.
When all the channels have been positioned and levelled you need to recheck and ensure that the back of the P Posts are all in
line and the diagonal (refer to steps 13 and 14) measurements of the P Posts are all correct and equal.
Before proceeding check the measurements for the width of the pool between the inside of the P. posts should be as per table
below.The width measurements (A or X) can have a variance of + or - 5mm.
If all of the measurements and levels are correct you can now proceed with the backfill of the channels across the pool and
cement mix at the end of the channels.
The excavation for the channels cross the pool needs to be filled in with a wet mix of 8 to 1. sand and cement.This needs to be
packed in firmly around the channels right across the pool into the excavations at the end of each channel and up to the ground
level (top of the channels)
NOTE: Top of the horizontal P Posts and ground should be level.
Model 2012 2412 2315 2715 3015 3815
Size 3.66 x 5.94 m 3.66 x 7.08 m 4.57 x 6.85 m 4.57 x 7.99 m 4.57 x 9.13 m 4.57 x 11.41 m
3.706 m 3.706 m 4.616 m 4.616 m 4.616 m 4.616 m
Distance A
Page view 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 63 64

Comments to this Manuals

No comments