Zodiac Jandy EE-Ti Specifications Page 22

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 21
Page 20
Page 21
6.3 Spring Start-Up
If your heat pump has been winterized, perform
the following steps when starting the system in the
Spring:
1. Uncover the heat pump and inspect the top and
sides for any debris or structural problems.
2. Close the petcock located on the lower front panel
of the heat pump.
3. Connect the water inlet and outlet unions located
on the lower front panel of the heat pump.
4. Turn on the lter pump to supply water to the
heat pump. Circulate water through the system
long enough to cycle all of the pool water through
the lter. Check for leaks in and around the heat
pump.
5. Turn on the electrical power to the heat pump at
the main breaker panel.
6.4 Inspection and Service
Jandy Heat Pumps are designed and constructed
to provide long performance life when installed and
operated properly under normal conditions. Periodic
inspections are important to keep your heat pump
running safely and efficiently through the years.
6.4.1 Owner Inspection
Jandy recommends that you inspect your heat
pump on a continual basis and especially after abnormal
weather conditions. The following basic guidelines are
suggested for your inspection:
1. Keep the top and surrounding areas of the heat
pump clear of all debris.
2. Keep all plants and shrubs trimmed and away from
the heat pump.
NOTE For spas, it is also necessary to perform water
changes in addition to chemical treatment. It is
recommended to change the spa water every
60 days for light usage and every 30 days if
usage is heavy.
6.2 Winterizing
CAUTION
Failure to winterize could cause damage to the
heat pump and will void the warranty.
ATTENTION
La garantie sera annulée si l’appareil n’est pas
hivernisé convenablement.
In areas where freezing temperatures occur, you
should protect your pump, filter, and heat pump from
the elements. Perform the following steps to completely
drain the heat pump (see Figure 14).
1. Turn off the electrical power to the heat pump at
the main breaker panel.
2. Shut off the water supply to the heat pump.
3. Disconnect the water inlet and outlet unions
located on the lower front panel of the heat pump.
4. Open the drain located on the lower front panel of
the heat pump to drain the remaining water from
the heat exchanger. Leave the drain open until the
unit is ready for seasonal start-up.
5. Cover only the top of the heat pump to prevent
debris from falling into the unit. Do not wrap the
sides of the heat pump with any plastic or other
material that will retain heat or moisture inside the
unit.
Water Inlet Union
Water Outlet Union
Petcock
(Leave open until unit
is ready to start-up)
Figure 14.
Winterizing the AE-Ti Heat Pump
Page view 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 31 32

Comments to this Manuals

No comments