Zodiac NOOSA REEF Instruction Manual Page 19

  • Download
  • Add to my manuals
  • Print
  • Page
    / 64
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 18
POSITIONING THE CHANNELS
17
A
B
Steel peg
Steel peg
String line
STEP 13.
To check the alignment of the P. posts, position a string line along the back of the posts between two (2) steel pegs.
(Points A and B) if the posts are not correctly aligned they need to be tapped back or forward until the back of each post is
correctly aligned with the string line.
Measure the two intersecting axis to ensure that the two straight sections are parallel.
The measurements of the points A to D and B to C must be equal.
AB
CD
STEP 14.
Once these steps have been completed you need to check the diagonal measurements of the pool frame.
Page view 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 63 64

Comments to this Manuals

No comments