Zodiac NOOSA REEF Instruction Manual Page 57

  • Download
  • Add to my manuals
  • Print
  • Page
    / 64
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 56
55
Open spoon
drain around pool
Concrete path
or walk way
Slop away
from pool
8:1 Coarse sand:cement
Slope of ground
Pool coping
Pool wall
Earth
50mm Gravel
around drainage pipe
450mm Wide
8:1 coarse
sand:cement
Underground drainage
system to remove water
around base of pool
Concrete path
or walk way
Slop away
from pool
450mm Wide
8:1 coarse sand:cement
50mm Gravel
around drainage pipe
Slope of ground
Earth
Pool wall
Earth
bank
450 mm Wide 8:1
coarse sand:
Excavated bank as per
Agricultural pipe
50 mm Gravel
New levelled ground
Pool
8:1 Sand & cement mix
around base of wall
E.G.L
Pool
8:1 Sand & cement mixl
E.G.L
8:1 Sand & cement mixl
Agricultural pipe
450 mm
50 mm Gravel
50 mm Gravel
E.G.L
Agricultural pipe
8:1 Sand & cement mixl
Pool
Approved retaining wall
Underground drainage
system to remove water
around base of pool
E. IN GROUND INSTALLATION
It is imperative when any part of the pool is installed below (finished) ground line, for inground installation or a sloping
site the pool wall must be maintained in a stable condition by carefully placed sub-soil drainage and prepared back-fill.
The maximum inground for the walls is 1220 mm, for pools up to 12m in length.
NOTES:
1. Prior to any backfilling, the pool is to be full of water for one day, check for any leaks.
2. Walls to be backfilled with 8:1 coarse sand/cement mix (machine mixed).
Use only sufficient water to hold mix together. Do not over moisten the mix. Ensure pool is full before
commencing backfill. Maintain pool full for one month after backfill.
3. Agricultural pipe to be continuous and sloped to the free outlet.
POOL IN GROUND
APPROVED RETAINING WALL
BY LOCAL AUTHORITY